The Dacre, Victoria

Highly sustainable, well-located commercial office space

  • Investment Strategy
  • LocationLondon
  • Date of Initial InvestmentNovember 2026
  • Bridges ExecutivesHenry Pepper, Freddie Sexton

Thesis

The built environment is one of the largest sources of carbon emissions, while energy use represents a substantial cost for small and medium-sized businesses. As such, highly efficient, all-electric buildings are increasingly what occupiers want – as a way to reduce their operating costs without compromising their decarbonisation commitments.

In London, demand for high-quality office space is shifting towards smaller, fully fitted floors that occupiers can move straight into. Supply of this kind of space is limited, particularly for small and growing businesses. Buildings that combine strong sustainability credentials with ready-to-use, well-designed workspace are therefore well placed to attract occupiers, and to stay relevant as energy-efficiency regulation tightens.

Investment

In 2026, Bridges partnered with Helvellyn Capital Partners to acquire The Dacre, a freehold office building in St James’s Park, Victoria, less than 100 metres from the Underground.

The building was comprehensively redeveloped in 2024 through a deep, low-carbon retrofit and extension of the original 1970s building. It provides c.24,000 sq ft over basement, ground and seven upper floors, with private terraces to six office floors, a communal roof terrace, and a concierge reception.

Three upper floors, totalling c.9,400 sq ft, have remained vacant since the redevelopment completed. Our business plan is to deliver a full sustainable fit-out of these floors and to refresh the reception and roof terrace, creating flexible, high-quality workspace suited to SMEs.

Outcomes

The Dacre is all-electric, rated EPC A and BREEAM Excellent. The 2024 retrofit cut the building’s regulated operational carbon emissions intensity about 13-fold compared with the original building. Its sustainability features include air source heat pumps, LED lighting, openable windows, and cycle storage with e-bike charging. Circular economy principles were applied throughout, including the reuse of raised access flooring.

Our fit-out of the vacant floors aims to maintain or improve the building’s EPC A rating, reduce operational carbon emissions from the fitted space by at least 20% per sq ft, and keep embodied carbon at least 30% below industry benchmarks.

Ultimately, we estimate the newly fitted floors will accommodate around 85 jobs. Their floorplates are especially well suited to SME occupiers, in a highly connected location with access to a labour pool of over 14 million people.